Projects
ENERGY

Busbar project for a hotel in Brussels
Implementation: Installation of 6 busbars from 250 A to 1000 A over a total length of 200 metres.
Partnership: Carried out with our partner Siemens.
Medium-voltage protection project for 2 transformers at a pharmaceutical plant
Assembly: Installation of a Schneider SM6 protection unit.


Replacement of 2 transformers at a cereal processing plant
Replacement: Two dry-type transformers of 1600 kVA each.
Customer constraint: As the customer could not shut down the installation for long, the work had to be completed in 1 day.
Benefit: Using two transformers allows parallel operation and avoids stopping production during maintenance.
Pulling and connecting power cables to supply a substation
Task: Pulling and connecting cables to supply a substation.