ENERGY

Busbar project for a hotel in Brussels

  • Implementation: Installation of 6 busbars from 250 A to 1000 A over a total length of 200 metres.

  • Partnership: Carried out with our partner Siemens.

Medium-voltage protection project for 2 transformers at a pharmaceutical plant

  • Assembly: Installation of a Schneider SM6 protection unit.

Replacement of 2 transformers at a cereal processing plant

  • Replacement: Two dry-type transformers of 1600 kVA each.

  • Customer constraint: As the customer could not shut down the installation for long, the work had to be completed in 1 day.

  • Benefit: Using two transformers allows parallel operation and avoids stopping production during maintenance.

Pulling and connecting power cables to supply a substation

  • Task: Pulling and connecting cables to supply a substation.