Logo de base – eBoltLogo de base – eBolt

Projects

INDUSTRY

Bottom ash recovery site

Electrical revamping of the existing production line and the new pre-treatment section.

Replacement of cable trays on the existing installation and installation of new cable trays on the new sections.

Manufacture and installation of new electrical cabinets: pre-treatment, safety and lighting.

Compliance upgrade of the electrical cabinets that were retained.

Replacement of all cables (power, signals, data) and reconnection to the existing equipment from the electrical rooms.
Wiring of the new equipment installed on the new sections.
Installation of lighting and service sockets on the new sections.
Migration to a fail-safe PLC, integrating safety and process management within a single controller.
Recommissioning of the renovated production line.

Some figures

  • Over 600 metres of cable trays installed on steel structures.

  • Over 4 kilometres of cables installed.

Aerospace project

Complete electrification of a satellite testing process in a vacuum chamber

Supply of the project cabinets and on-site wiring in Germany.

Pulling of 550 metres of 120 and 185 mm² power cables and connection in the main switchboards

Mechanical installation of cable trays and approaches to the switchboards.

Furnace project

Objective: Implementation of the electrical system for an industrial furnace.

Supply of cabinets and main switchboards: Delivery and installation of electrical cabinets and main switchboards tailored to the specific needs of the furnace.

Cable pulling: Installation of control and power cables, providing the electrical connection between the various components of the system.

Substation wiring: Installation and electrical connection of the substation, guaranteeing the power supply required for the furnace to operate.

Complete mechanical installation of the furnace: Stainless steel cable trays.

You may also be interested
in these articles